A. 2,100MW
B. 3,100MW
C. 800MW
D. 1,100MW
Explanation
The PAEC termed it a ‘Pakistan Day’ gift to the nation. It said the nuclear power plant (NPP) had achieved criticality at the end of February and was undergoing certain safety tests and procedures before it could finally be connected to the national grid.
Show/Hide Explanation
A. 2 years
B. 5 years
C. 100 years
D. 10 years
Explanation
Pakistan and Qatar have signed another long-term Liquefied Natural Gas (LNG) supply contract for additional 200 million cubic feet a day (MMCFD) at around 31 per cent lower rate than the 2015 contract for 500MMCFD.
Show/Hide Explanation
پاکستان میں پیٹرولیم کی تلاش کب شروع ہوئی؟
A. 1996
B. 1908
C. 1948
D. 1866
Explanation
Petroleum exploration in Pakistan began in the early 1860s during the British colonial period. The first oil well was drilled in 1866 near Kundian, Punjab, by the Burmah Oil Company.
***
1950 : Pakistan Petroleum Limited (PPL) was established.1952 : The first oil field in Pakistan was discovered in Balochistan, near the Sui gas field.1957 : PPL discovered natural gas in Khairpur.1960-70 : Exploration shifted from gas to oil.1961 : PPL and Pakistan Oilfields began drilling with Soviet assistance.1964 : Activity began in the Toot oil field in Punjab.2001 : MGCL was granted a license to explore oil and gas.2005 : International Sovereign Energy signed a memorandum of understanding with the Oil and Gas Development Company Limited to develop the Toot field.
Show/Hide Explanation
پاکستان کا پہلا ونڈ پاور پلانٹ کہاں واقع ہے؟
A. Jhimper
B. Karachi
C. Thana Bula Khan
D. Kashmore
Explanation
The Zorlu Enerji 50 MW Project is the first ever wind power plant of Pakistan and was inaugurated in April 2009 at Jhimpir, Sindh.
Show/Hide Explanation
A. National Transmission and Database Company
B. National Transmission and Despatch Company
C. National Transmission and Despatch Corporation
D. National Transmission and Desk Company
Explanation
National Transmission & Despatch Company is a Pakistani autonomous power transmission company under ministry of Energy.
NTDC headquarters located in Lahore .
Show/Hide Explanation
جون 2023 میں ڈسکاؤنٹ ڈیل کے تحت پاکستان کی روسی خام تیل کی پہلی کھیپ کس شہر کو موصول ہوئی؟
A. Multan
B. Lahore
C. Quetta
D. Karachi
Explanation
Pakistan got first shipment of Russian crude under discount deal.
The cargo carrying 45,000 metric tonnes of crude oil arrived Karachi on 11 June 2023.
Show/Hide Explanation
A. 2050
B. none of the above
C. 2040
D. 2030
Explanation
Pakistan aims to generate 30% of its electricity from renewable energy sources by 2030 such as wind, solar, biomass and small-scale hydro. This will complement the 27% of current electricity supply coming from large-scale hydro.
Show/Hide Explanation
مٹیاری_لاہور ٹرانسمیشن لائن کی لمبائی کتنی ہے؟
A. 900 km
B. 878 km
C. None of these
D. 800 km
Explanation
The Matiari-Lahore transmission project is an 878 km-long , 660 kV HVDC transmission line under CPEC and China's BRI.This project aims to enhance Pakistan's electricity transmission capacity and connectivity.
Show/Hide Explanation
A. Grip
B. None
C. Both
D. Release
Show/Hide Explanation
A. Killed
B. Crashed
C. Smashed
D. Broke
Explanation
The ball was struck so hard it broke the window glass.
گیند اتنی زور سے ٹکرائی جس سے کھڑکی کا شیشہ ٹوٹ گیا۔
The word "broke" accurately describes the result of a forceful impact that caused the glass to crack or shatter.
Show/Hide Explanation
✅ Correct: 0 |
❌ Wrong: 0 |
📊 Total Attempted: 0