The prime numbers between 64 and 81 is = 67, 71 ,73,79
A contract is a type of legally binding written or spoken agreement.
A valid contract will create a mutual obligation.
This means that each of the parties is obligated, or required, to perform a duty under the contract.
The contract conditions determine the parties' obligations.
ND5-09-2023
The first 5 composite numbers are 4, 6, 8, 9, 10.
composite numbers are those that can have factor other than one and itself
Sum of first 5 composite = 4+6+8+9+10=37
S.I=P*R/100*T
S.I=65800*14/100*4=658*14=36848
Final deposit =65800+36848=102648
(x-5)/x
(x-4)/(x+1)=2/3
2x+2=3x-12
x-12=2
x=14
10/15=2*5/(3*5)=2/3
the origional fraction is (14-5)/14=9/14
Speed = 36 km =36*100 36*100om/3600 sec=10m/s
Distance = speed* time =10 *20 =200 m
Lowest window install = 100/6 = 16.6
Maximum windows install =100/8 =12.5
Required answer should be greater than 12.5 but less than 16.5
which is possibly 16 hours
It can be solved in a simple way
Profit = (12500 - 12000) + (52500-50000) - (13000 - 12000) - 2000
= 2500 + 2500 - 1000 - 2000
= 5000 - 3000
= 2000 profit
A percentage is a number or ratio expressed as a fraction of 100.
20% as a fraction is 1/5.
ND11-3-2023
Area of tile= 2*2=4
Area of floor= 17*12= 204
Required tiles = 204/4 = 51 tiles