The difference between the budgeted amounts and the actual results is classified as:
Answer: Variances
Explanation
Difference between budgeted amounts and actual results is classified as variances.
This question appeared in
Past Papers (1 times)
FPSC Past Papers (1 times)
Related MCQs
- Which cover the capital expenditure, budgeted statement of cash flows and balance sheet that part of the master budget are classified as :
- According to Aristotle the movement that results in actual sensation is _____?
- The labor rate variance is determined by multiplying the difference between the actual labor rate and the standard labor rate by ______?
- The actual width (w) of a rectangle is 18 centimeters (cm). Use the scale drawing of the rectangle to find the actual length (l).
- Jerry estimates that there are m marbles in a jar. Harry, who knows the actual number of marbles in the jar, notes that the actual number, n, is within 10 marbles (inclusive) of Jerry's estimate. Which of the following inequalities represents the relationship between Jerry's estimate and the actual number of marbles in the jar?
- A car travelling with 5/7 of its actual speed covers 42 km in 1 hr 40 min 48 sec. Find the actual speed of the car
- If the difference in time between two places were 2 hours and 20 minutes, then the difference in their longitude would be:
- Your behaviour amounts to ________ misconduct.
- Milk of the animals fed on grass contains large amounts of fat in:
- Criminal intimidation by anonymous complaint amounts to